Electric Soul (Trap Remix)

Electric Soul (Trap Remix)

ESCAPE

0:003:28
Trap·March 12, 2025·
3:28
Remix

Electric Soul (Trap Remix)

ESCAPE

1.3M plays
27K likes
142 BPM

About This Track

Taking the neo-soul harmonic material from Electric Soul and running it through a trap production framework felt like a natural experiment — the warmth of the chord voicings colliding with the aggression of 808s and stuttering hi-hats. The result is something that works as a standalone production while maintaining a genetic link to the original.

Tags

TrapRemixR&B Fusion

Details

Genre

Trap

Artist

ESCAPE

BPM

142

Key

D Minor

Duration

3:28

Released

March 12, 2025

Electric Soul (Trap Remix)

Stats

1.3M

Plays

27K

Likes

Back to Music